Islanded simple-cycle
76 questions this plant already has.
You are not the designer. You audit the drawing, defend the field, and have to be useful at first fire. Start at Plant identity if you do not yet have the three facts that hang every other module.
Primer will not invent this plant’s megawatts, kV, or machine model. Shop-floor physics lives on trades.
Confidence discipline
Unverified on any plant of this type
Not answers. Things a primer must refuse to guess. Pull them from the named document.
Exact machine model, variant, and combustor type (DLN vs diffusion with diluent)
Vendor submittal; mechanical equipment schedule
Any first-of-a-kind unit — rating, control platform, reference installation
Vendor submittal; FOAK package
SCR presence, catalyst type, tempering / heat management
Mechanical drawings, P&IDs, air permit
Aqueous ammonia concentration and PSM/RMP applicability
Process piping section; ammonia skid submittal
Generator terminal voltage, step-up, distribution voltage levels
Electrical one-lines
System grounding method (solid / LRG / HRG / ungrounded)
One-lines and grounding study
Inlet cooling — whether installed, and of what type
Mechanical drawings
Headline capacity: ISO, site, or net delivered
Owner basis of design
Thrust restraint design authority
Often absent — RFI, not a field guess
Pressure-class conflict between site-utility and fire protection
Order of precedence, then RFI to EOR
06 questions
Plant identity
Islanded, behind-the-meter, computing load. Every unusual drawing traces to those three.
09 questions
The machine
Brayton cycle, back-work, derate, Wobbe, SCR on hot exhaust. A turbine is not 'a turbine.'
09 questions
The island
Frequency is shaft speed. Fault current decays. 51V, droop, black start, sync.
08 questions
Piping and BOP
Pipe class literacy, B31.1, WPS/PQR/WPQ, pickling, nozzle loads, hydro extent.
08 questions
Civil and foundations
Expansive clay, drilled piers, hot-weather concrete, PEMB setting-plan loop.
08 questions
Controls and loops
P&ID as a narrative. Loop check ≠ functional test ≠ logic test. Two overspeeds.
08 questions
Construction execution
IFC versus permit set. RFI as design-intent. Hold versus witness. Diagrammatic drawings.
08 questions
Commissioning
Area to system. Six milestones. Lube-oil flush as schedule risk. Real trips, not simulated.
06 questions
Operations
Part-load heat rate versus spinning reserve. Surge. Hours versus starts. Peak demand plus peak ambient.
06 questions
Codes and permits
B31.1 versus B31.3. NFPA 56 before gas. PSD/BACT. Aqueous ammonia thresholds. IEEE literacy.